The system was delivered successfully in 2012, ahead of first oil in 2013. Engineers from Adept commissioned the system on site in the Algerian desert in September 2013 and it currently allocates approximately 100,000 barrels of oil, 15,000 barrels of condensate, 6,000 barrels of liquefied petroleum gas (LPG) and 160 million standard cubic feet of gas per day.